06-01-12

Door fit

Took the doors from the attic and dismantled them (they weigh a ton with all the windows etc.).
tail fitted the left door, fixated it with the wright gabs and made the first welds
First door fit.jpgFirst door fit (1).jpg

 

 

 

 

 

 

 

 

When the right door is fixated and the pillar is tackwelded as well, I will start on the window surrounding.

22:35 Gepost door Paul | Permalink | Commentaren (0) |  Facebook |

De commentaren zijn gesloten.